With only a 16-month construction and move-in timeframe, the Glazer Children's Museum required exterior cladding that could be installed quickly. In addition, the design team wanted a striking building to serve a demonstration tool, teaching children about sustainability and protecting the environment.
|
Architect:
|
GouldEvans
|
|
General Contractor:
|
Delotto & Sons
|
|
Installer:
|
FG Metals
|
|
Location:
|
Tampa, FL
|
|
Products:
|
|